Does this repair need a permit? We sort that out first
Send us the repair list
The address, who did the inspection, and the items it flagged. We reply with what needs a permit and what it costs.
Does the repair need a permit?
That is usually the first question after a chimney fails a Level 2, and the honest answer depends on the work. Swapping a cap, sealing a crown or repointing a few joints is maintenance in most cities. Rebuilding a stack, adding a liner to a fireplace, installing a gas insert or running a new vent generally involves the local building department, because it changes the structure, the venting or the gas supply.
Rules differ between cities, and Norwalk, Bellflower, La Mirada and Lakewood each set their own process. We do not guess. Each written quote says whether we expect a permit for that job, and if one is needed we plan the work around the city's inspection.
How sign-off works
Where a permit applies, the city usually wants to see the work at set points, for example a liner before it is closed in or a gas line before the insert is fitted. We schedule so those points can be seen. Once the inspector signs off, that record goes into your file along with our invoice and photos.
For a house in escrow, that signed record is what a buyer's agent asks for. It shows the work was done and checked, not just paid for.
- Quote states whether a permit is expected
- Work staged around the city inspection points
- Sign-off, invoice and photos kept together for the file
Which fixes we price up front
Crickets with or without new flashing, leak repairs and gas inserts are close enough in scope from house to house that we publish a range. The figure inside the range depends on the size of the chimney and how hard the roof is to work on. Caps are quoted after we measure.
Crown rebuilding, relining, damper replacement, a chase cover on its own and masonry repairs vary too much to print. Those get a written price once we have seen them.
Common fixes and their prices
Published ranges for the repairs we see most after a failed inspection. The cap, last, is quoted after we measure. Whether each needs a permit is noted on your quote.
- Finding and stopping water entry at the stack
- $530 to $3,200
- Roof diverter plus fresh metal at the base
- $640 to $1,600
- Roof diverter behind a broad stack
- $425 to $960
- Gas heating unit fitted into the current opening
- $2,650 to $5,300
- Follow-up camera run once repairs are finished
- $370
- Flue cap made to fit and fastened in place
- Quoted after we measure
Permit fees set by the city are separate from our price and are listed on the quote when they apply.
Permit and code questions
Who applies for the permit?
When our work needs one, the quote says so, sets out who files the application and lists the city fee on its own line.
Does a new cap need a permit?
In most cities a cap swap is treated as maintenance. If your city treats it differently, the quote will say so.
Can the repairs be done before the house closes?
Often, yes. We schedule around the city inspections where a permit applies. We cannot promise a date the building office controls.
Will the buyer get proof the work was approved?
Yes. The sign-off record, our invoice and photos of the finished work go to whoever you name.
Do you rerun the camera after the repairs?
We can. A follow-up Level 2 gives the file a clean report dated after the work.
Find out what needs a permit before you start
Send your inspection findings through the contact page and we answer the permit question with the price.
Call (562) 449-0592